Energy Solution Overview

PROJECT TARGET

Wastewater Flow & Distance

  • 5,000 BTU/hour per GPM
  • 0.3 Cooling tonnes per GPM

Minimum Load Requirements

  • “Heating load: 1 MBtu +
  • Cooling load: 60 cooling tonnes +

Process or Building Heating & Cooling Requirements

  • Central cooler/boiler if both heating and cooling are provided
  • New build or retrofit
  • Industrial/wastewater treatment plant projects in excess of 40,000 sq. ft.

NOVA,The Urban Geothermal Solution

6effe61a-5cc6-4efa-a998-0825cc7785b6
131d3611-d610-48ba-b302-0b0d0208a6db

Wastewater System

Digester/Other Process Heat Requirements

Building/Gallery Heating & Cooling

  • Hot water design up to 160°F
  • Cold water design as low as 44°F